Construction RFI Log Generator

Professional commercial RFI register with automated sequential numbering, review deadline tracking, overdue aging alerts, and instant Excel exports.

100% In-Memory Execution

Zero cloud storage of project numbers, pricing, or documents. Data stays strictly inside your browser.

Project Specification & Header Data

Header metadata prints cleanly on exported reports and formal submittal covers.

Privacy Note: When “Save on This Device” is clicked, data is saved strictly inside this browser's localStorage (bdp_tool_rfi_log). If using a public or shared computer, click “Clear Data” when finished. No data is ever transmitted to remote cloud servers.
Total RFIs4
Open / In Review3
Closed / Resolved1
Overdue (>7d)2
Cost Impacts1
Threshold:
RFI #DisciplineDrawing / SpecSubject & QuestionReviewerSentAgingStatusImpactActions
RFI-001Structural
S-102
03 30 00
Foundation dowel placement at Grid B-4 conflict
Plumbing rough-in conflicts with 24-inch spread footing rebar cage at Grid B-4. Requesting structural engineer approval for relocated dowels.
Official Response: Approved per Structural Sketch SK-04. Offset dowels 6 inches North.
Apex Structural Lead2026-10-105dClosedCost: No
RFI-002Architectural
A-501
08 11 00
Door 104B frame throat dimension discrepancy
Partition type P-2 on Sheet A-101 indicates 6-inch CMU with 7/8 furring, but Door Schedule on A-501 specifies a 5-3/4 throat frame. Please clarify required frame throat depth.
Project Architect2026-10-1213dOpenCost: TBD
RFI-003Electrical
E-201
26 51 00
Luminaire Type F-4 ceiling suspension conflict
Fixture Type F-4 continuous linear pendants intersect main supply ductwork in Corridor 102. Requesting 8-inch offset or remote ballast approval.
Official Response: Under evaluation with mechanical coordination team.
MEP Engineer of Record2026-10-0520dUnder ReviewCost: Yes
RFI-004Mechanical
M-301
23 31 00
RTU-2 roof curb seismic tie-down detail clarification
Specification 23 05 48 requires IBC seismic isolation clips, but detail 4/M-301 shows direct weld to structural curb. Confirm tie-down attachment spec.
Structural / Mechanical Engineers2026-10-205dOpenCost: No