Architectural CAD Blueprint and Structural Construction Framework
+
+
+
+
BD / PORTAL • GCS

Preconstruction Document & Bid Support for General Contractors

Stop losing estimators to administrative paperwork. Send us your project manuals, addenda, and trade bids for structured, traceable reviews.

24–48 HRTypical Delivery
100% CITEDDirect Sheet Citations
UPFRONT QUOTENo Hourly Meters
SHEET GC-01 • PRECONSTRUCTION COORDINATION & BID LEVELING
GC DESK // ACTIVE
TRADE: DIV 03 CONCRETEBID A vs B LEVEL: ALIGNED0 UNTRACKED SCOPE GAPSREV-02 DELTA+1,850 SF WALLPRECON SCOPE MATRIX // 03 TRADES• MECHANICAL: COMPLETE (0 EXCLUSIONS)• ELECTRICAL: ALL ADDENDA ACKNOWLEDGEDQC100% CITED
14 TRADES SYNCED
ALL DRAWINGS REFERENCED
SCOPE GAP AUDIT100% LEVEL
ADDENDUM DELTAACTIVE
SLA DELIVERY24-48 HR
DELIVERABLE INSPECTION // GCS

Sample Deliverable Output

Authentic construction deliverables structured specifically for general contractors.

Drawing Revision Comparison • Addendum Delta Audit

DELIVERABLE: DELTA REGISTER + MARKED CAD/PDF
01 // ORIGINAL BID SETSHEET A-102 (REV 0)
24'-0"CONF 101OPEN OFFICE
BASE CONTRACT DRAWINGSPRE-BID RELEASE
02 // ADDENDUM 02 BULLETINSHEET A-102 (REV 2)
10'-0"14'-0"1STORAGECONF 101OPEN OFFICE
DELTA CLOUD // DELTA TAG 1+14 LF PARTITION ADDED
03 // DELTA AUDIT REGISTERDELIVERABLE XLSX
09 22 16 Framing / DrywallRECHECK REQUIRED
Add 14 LF Type-B rated partition to Grid C-2
QUANTITY DELTA:+14 LF / +224 SF
08 11 00 Doors & FramesRECHECK REQUIRED
Add 3070 HM Door + Frame mark 101B
QUANTITY DELTA:+1 Opening
26 51 00 Lighting PackagesRECHECK REQUIRED
Relocate 2x2 LED troffers in reconfigured Conf
QUANTITY DELTA:2 Relocations
100% Traceable to Drawing Delta 1PAGE 1 OF 3
CITATION // ARCHITECTURAL BULLETIN ADDENDUM 02 • SHEETS A-101 TO A-108 & E-201
CONFIRMED DELTA: 3 AFFECTED TRADES • 0 MISSED SCOPE
TRANSPARENT WORKFLOW

What You Send • What We Do • What You Receive

01 // WHAT YOU SEND

Client-Supplied Files

Provide whatever plans, addenda, or specifications you currently have. We audit strictly from supplied files:

  • •Project manuals, RFPs, and Instructions to Bidders
  • •Drawing sets (Original vs. Addenda / Bulletin revisions)
  • •Specification sections and project special conditions
  • •Subcontractor bids, proposals, and trade scope letters
02 // WHAT BUILDDESK DOES

Human Estimator Review

Our preconstruction specialists examine, compare, cross-check, and extract:

  • Audit documented submission requirements, bid bonds, and required forms
  • Compare original bid sheets to revised drawings and flag delta impacts
  • Extract and organize scope items into multi-bid comparison matrices
  • Flag ambiguous notes, missing attachments, and scope overlap
03 // WHAT YOU RECEIVE

Actionable Work Product

Structured Excel delta registers and marked high-resolution PDF drawing sheets:

  • Bid Requirements Checklist (Ready / Missing / Verify / Action items)
  • Revision Impact Report (Drawing delta, affected scopes, quantities to recheck)
  • Scope Gap & Bid Comparison Matrix (Normalized line items across trade bids)
SERVICE CATALOG

Tailored Services for GCs

Bid Requirements Checklist

Bid Compliance Review

Comprehensive audit of Instructions to Bidders, mandatory submission forms, addenda acknowledgements, and bond requirements.

Flagship Service
Revision Impact Report

Addendum & Revision Impact Review

Sheet-by-sheet comparison between original bid drawings and addenda/bulletins to isolate scope modifications and rechecks.

Scope Comparison Matrix

Scope Gap & Bid Comparison

Standardized bid leveling matrix comparing subcontractor proposals against drawings and specification requirements.

Partner Network
CSI Quantity Takeoff & Bid Support

Estimating & Takeoff

Professional construction estimating, quantity takeoffs, material takeoffs, and bid support to help general contractors manage preconstruction workload and prepare competitive bids.

PRECONSTRUCTION CAPACITY MULTIPLIER

Solve Estimator Bandwidth Without Adding Fixed Overhead

During peak commercial bid cycles, chief estimators are overwhelmed by mechanical paperwork: auditing 100-page project manuals for non-collusion forms, cross-checking 15 addenda sheets, and manually leveling conflicting trade quotes. BuildDesk steps in as your independent preconstruction documentation desk.

Plug-Number Leveling

Normalize unpriced trade exclusions with calculated plug numbers to prevent bid-day scope busts across Div 03, 07, and 09.

RFP Submission Defense

Systematic audit of Division 00/01 project manual requirements, checking specified bond formatting (e.g. AIA A310), affidavits, and participation schedules where required.

PROJECT FLAT RATES: TYPICALLY $129–$349Typical 24–48 Hr Turnaround Based on Document Volume
Send GC Project Docs
QUESTIONS & ANSWERS

Frequently Asked Questions — GCs

Q1.How quickly can BuildDesk return an Addendum & Revision Impact Review?

Standard turnaround for small-to-medium bulletin releases (5–25 sheets) is 24 to 48 hours. When you send your files, we review the sheet count and provide an agreed turnaround target with your firm quote.

Q2.Does BuildDesk contact trade contractors directly for scope clarification?

No. BuildDesk operates strictly within client-supplied documents. We identify scope gaps, missing items, and ambiguous proposals, providing you with a clear checklist so your team can reach out to subcontractors with exact questions.

Q3.How does BuildDesk normalize bids when trade proposals exclude critical scope items?

We employ structured plug-number normalization. Our estimators identify line-item exclusions across trade proposals (such as equipment hoists, traffic control, or warranty extensions) and calculate plug values based on specification requirements, enabling chief estimators to evaluate true apples-to-apples trade costs.

Q4.What are your flat fees and turnaround times for General Contractor reviews?

All work is delivered at upfront flat rates with zero monthly software retainers. Bid Compliance Reviews are $129–$229 (24-hr turnaround). Addendum & Revision Reviews are typically $149–$349 per bulletin (24–48 hr). Scope Gap & Bid Leveling Matrices are typically $179–$349 per trade division.

Q5.Can you review private negotiated proposals as well as public hard-bid RFPs?

Yes. Our bid compliance checklists and scope comparison matrices work equally well for public municipal RFPs (FAR compliance, prevailing wage, DBE goals) and private negotiated commercial developments.

Standard 24–48 Hour Review Turnaround Available

HAVE A GCS PROJECT READY?

Send us the project files. We confirm sheet count, turnaround, and an exact flat fee before work begins.

Direct Intake: ryan@builddeskpartners.com+1 (786) 887-8700Turnaround: 24–48 Hours TypicalWyoming Registered & Florida Administrative Offices