
Construction Document Support for Subcontractors
Protect your margins and submit error-free proposals. We review project specifications, audit your trade scope coverage, and organize submittal packages.
Sample Deliverable Output
Authentic construction deliverables structured specifically for subcontractors.
Bid Requirements Checklist • Audit Sheet Register
| SUBMISSION REQUIREMENT | DOCUMENT CITATION | CRITERIA | IN SUBMITTAL? | AUDIT STATUS | ACTION NOTES |
|---|---|---|---|---|---|
| Official Bid Proposal Form | Spec 00 41 13, p. 12 | Mandatory | Yes | FOUND / VERIFIED | Signed by authorized corporate principal with seal |
| Addenda 1 & 2 Acknowledgement | Addendum 02, p. 1 | Mandatory | Yes | FOUND / VERIFIED | All released addenda numbers & dates acknowledged |
| 5% Bid Bond on AIA A310 | Spec 00 21 13 §4.2 | Mandatory | Review | RECHECK REQUIRED | Draft bond provided; verify surety attorney-in-fact power |
| Non-Collusion Affidavit | RFP Vol 1, p. 28 | Mandatory | Missing | NOT IDENTIFIED | Form attached but notary jurat block is blank |
| MWBE Participation Schedule | Section 00 45 39 | Conditional | Partial | CLARIFICATION REQUIRED | RFP goal is 18%; draft submittal list totals 15.5% |
Verification matrix for trade bid submissions and GC compliance riders.
Audit matching drawing notes against subcontractor proposal exclusions.
Organized CSI-divided PDF package with cover sheets and tracking log.
What You Send • What We Do • What You Receive
Client-Supplied Files
Provide whatever plans, addenda, or specifications you currently have. We audit strictly from supplied files:
- •Contract plans and trade specification sections (Divisions 02–33)
- •Addenda, bulletins, and revised drawing sheets
- •Your draft proposal, quote worksheet, or scope exclusions
- •Product cut sheets, safety data sheets (SDS), and manufacturer specs
Human Estimator Review
Our preconstruction specialists examine, compare, cross-check, and extract:
- Verify GC bid package requirements and mandatory trade affidavits
- Compare original vs. revised drawings to isolate changes affecting your specific trade
- Cross-check your proposal exclusions against specification requirements to uncover scope creep
- Assemble, bookmark, and index product submittal packages with cover sheets
Actionable Work Product
Structured Excel delta registers and marked high-resolution PDF drawing sheets:
- Subcontractor Bid Requirements Checklist
- Trade Revision Impact Summary
- Scope & Proposal Coverage Audit (Covered / Missing / Excluded / Clarify)
- Organized CSI-compliant Submittal Package (PDF bookmarked with register)
Tailored Services for Subs
Bid Compliance Review
Ensure trade bids satisfy GC submission instructions, insurance minimums, warranty terms, and addenda receipts.
Addendum & Revision Impact Review
Isolate exactly what changed in your trade drawings and specifications between original bid release and subsequent addenda.
Scope & Proposal Review
Systematic cross-check between contract documents and your draft proposal to identify uncovered scope and exposed risks.
Submittal Package Preparation
Compile client-supplied product data, cut sheets, and warranty information into clean, bookmarked CSI submittal packages.
Estimating & Takeoff
Trade-specific estimating and quantity takeoff support for subcontractors preparing bids, calculating materials, reviewing quantities, and managing estimating workload.
Subcontractor Scope Shield: Stop Unclouded Revisions & Scope Creep
Specialty trade contractors routinely lose margin to unclouded architectural changes and ambiguous subcontract flow-downs. When an addendum silently changes wall types, finish levels, or equipment hookup locations without revision clouds, trades get stuck eating the delta. BuildDesk compares drawings sheet-by-sheet and audits your proposal exclusions before you sign.
We audit revised drawing sets sheet-by-sheet to detect graphic callouts and specification changes that lack architect delta clouds.
Cross-check your proposal exclusions against GC bid packages to ensure trade boundaries (backing, temp power, moisture prep) are explicitly protected.
Free Operational Tools for Subcontractors
Zero-overhead utilities to protect trade margins and streamline communication:
Audit CSI trade interface boundaries to prevent unpriced scope handovers before proposal submission.
Track supplier lead times, fabrication milestones, and FOB delivery dates for critical path materials.
Log drawing discrepancies, engineering queries, and GC response deadlines to preserve change order rights.
Frequently Asked Questions — Subs
Q1.Can BuildDesk compile submittals if we only provide product model numbers?
BuildDesk works primarily with client-supplied product documents. If you provide the cut sheets or specific manufacturer links, we index, bookmark, stamp, and assemble them into a cohesive package. We do not independently select engineering products.
Q2.How does the Scope & Proposal Review protect my company?
By comparing your proposal text against the architectural notes and Division specifications, we flag items that the architect specified but your proposal did not explicitly exclude or include, preventing costly disputes after award.
Q3.What are your turnaround times and pricing for subcontractor document reviews?
Trade Bid Compliance Reviews are delivered in 24 hours at $129–$229 per bid package. Scope & Proposal Reviews are typically $149–$279. Addendum Revision Impact Reviews are typically $149–$349 per bulletin with 24–48 hour turnaround.
Q4.How do you detect unclouded drawing changes that affect my trade scope?
Our estimators conduct structured sheet-by-sheet comparative audits between the original bid sheets and revised bulletin releases. We cross-reference trade floor plans, schedules, and details to isolate graphic revisions and specification updates that lack architect revision clouds.
Q5.What trade divisions do you support?
We support all CSI MasterFormat divisions, including Division 03 (Concrete), Division 04 (Masonry), Division 06 (Wood/Plastics), Division 07 (Thermal/Moisture), Division 08 (Openings), Division 09 (Finishes), Division 26 (Electrical), and more.
HAVE A SUBS PROJECT READY?
Send us the project files. We confirm sheet count, turnaround, and an exact flat fee before work begins.