
Flat-Fee Preconstruction Support Pricing & Turnaround SLAs
We review your project documents first and confirm an exact fixed price before work begins. Zero monthly software overhead, zero user seat licenses.
- Fixed upfront price confirmed before work begins based on your documents
- No monthly platform subscriptions, user licenses, or recurring lock-in fees
- All reviews performed strictly from client-supplied construction documents
- Deliverables provided in standard Excel (.xlsx) and high-resolution PDF formats
Pricing for General Contractors
Flat, predictable preconstruction support to audit RFP bid packages, isolate bulletin drawing deltas, and normalize subcontractor quotes.
Bid Compliance Review
Full audit of Instructions to Bidders, mandatory submission forms, bond requirements, and addenda acknowledgements.
- Bid Requirements Checklist (Ready / Missing / Verify)
- Mandatory form citation table with exact page numbers
- Addenda acknowledgement log across all revisions
- 24-hour standard turnaround
Addendum & Revision Impact Review
Systematic sheet-by-sheet comparison between original bid drawings and addenda bulletins to isolate scope modifications.
- Revision Impact Report (Drawing deltas & affected trades)
- Sheet-by-sheet change register with cloud citations
- Quantities and scopes requiring estimator recheck
- Fast 24–48 hour turnaround
Scope Gap & Bid Comparison
Side-by-side proposal normalization comparing subcontractor bids against project drawings and specifications.
- Standardized Bid Leveling Matrix (Excel)
- Scope gap, omission, and exclusion flags
- Comparison of 3 to 6 trade proposals per division
- Specification cross-reference notes
Pricing for Subcontractors
Focused document reviews to ensure compliance with GC submission criteria, prevent missed drawing revisions, and audit proposal exclusions.
Trade Bid Compliance Review
Audit trade bid requirements, mandatory affidavits, insurance limits, and bond riders before GC submission.
- Trade Bid Compliance Checklist
- GC submission requirement verification
- Addenda acknowledgement check
- 24-hour turnaround
Scope & Proposal Review
Cross-check draft trade proposals against contract drawings and division specifications to uncover hidden scope exposure.
- Proposal Scope Coverage Audit
- Itemized Covered / Missing / Excluded matrix
- Drawing callout and note cross-reference
- Uncovered scope risk identification
Submittal Package Preparation
Organize client-supplied product data, cut sheets, and warranty information into clean, bookmarked CSI submittal packages.
- Bookmarked CSI Submittal Package (PDF)
- Highlighted model numbers and finishes
- Trade Submittal Tracking Log (Excel / CSV)
- Cover sheet formatted to project standards
Pricing for Material Suppliers & Distributors
Turn plans into quote-ready material takeoff schedules and calculate exact drawing revision quantity deltas without pulling sales reps from selling.
Drawing Revision Quantity Delta
Precision comparison between original drawings and addendum sets showing exact additions, removals, and net quantity changes.
- Quantity Delta Report (Original vs. Revised Qty)
- Net addition / deduction calculations
- Revision markup plan comparison with cloud references
- Fast quote update support
Product Schedule Extraction
Convert drawing schedule tables (doors, frames, hardware, fixtures, finishes) into clean, quote-ready spreadsheet worksheets.
- Quote-Ready Schedule Worksheet (Excel)
- Plan tag cross-reference verification
- Discrepancy log of missing or conflicting tags
- Sortable by mark, size, rating, and manufacturer
HAVE A PROJECT READY?
Send your drawings, specifications, or addenda. Our senior preconstruction team will review the scope and deliver clear, traceable answers on guaranteed turnaround.