SUB-02FREE CONTRACTOR UTILITY
Construction Submittal Log Builder
Standardized commercial submittal schedule with CSI specification tracking, shop drawing revision cycles, architectural approval stamps, and procurement lead-time risk alerts.
100% In-Memory Execution
Zero cloud storage of project numbers, pricing, or documents. Data stays strictly inside your browser.
Project Specification & Header Data
Header metadata prints cleanly on exported reports and formal submittal covers.
Privacy Note: When “Save on This Device” is clicked, data is saved strictly inside this browser's localStorage (
bdp_tool_submittal_log). If using a public or shared computer, click “Clear Data” when finished. No data is ever transmitted to remote cloud servers.OFFICIAL CONSTRUCTION SUBMITTAL SCHEDULE
Metropolitan Medical Pavilion • Job #2026-BD-104
Contractor: BuildDesk Commercial Partners
Architect/Engineer: Apex Design & Engineering Group
Log Date: 2026-10-25
Total Submittals5
Approved / As Noted2
Pending Review2
Revise / Resubmit1
Lead Time Critical1
| Submittal # | CSI Spec | Description & Trade | Type | Rev | Status / Stamp | Required Site | Lead Time | Procurement | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 03 30 00-01 | 03 30 00 | Cast-in-Place Concrete Mix Designs (4000 PSI Slabs & Footings) Sub/Vendor: Titan Concrete Supply Review Note: Approved without exceptions. Slump and air entrainment verified. | Product Data | Rev 0 | Approved | 2026-11-15 | 2 wks | Order: 2026-11-01 | |
| 08 11 00-01 | 08 11 00 | Hollow Metal Doors & Knock-Down Frames Shop Drawings Sub/Vendor: Vanguard Door & Hardware Review Note: Verify throat size on Room 104 frames per RFI-002 prior to fabrication. | Shop Drawings | Rev 1 | Approved as Noted | 2026-12-01 | 6 wks | Order: 2026-10-20 | |
| 07 54 00-01 | 07 54 00 | 60-Mil TPO Single-Ply Membrane & Tapered Polyiso Fastener Layout Sub/Vendor: Apex Roofing Contractors Review Note: Wind uplift calculation package included. | Shop Drawings | Rev 0 | Sent to Architect/Engineer | 2026-12-15 | 5 wks | Order: 2026-11-10 | |
| 26 51 00-01 | 26 51 00 | Type F-4 Architectural LED Linear Pendant Cutsheets Sub/Vendor: Precision Electric Systems Review Note: Rejected remote ballast model; STC acoustic ceiling suspension missing. | Product Data | Rev 0 | Revise & Resubmit | 2026-11-30 | 8 wks | RISK (<14d) | |
| 09 30 00-01 | 09 30 00 | Restroom Porcelain Tile 12x24 Physical Color Samples Sub/Vendor: Grand Tile & Marble Review Note: Sample physical box delivered to GC job trailer for transmittal. | Sample | Rev 0 | Submitted to GC | 2027-01-15 | 4 wks | Order: 2026-12-18 |
NEED DEDICATED PRECONSTRUCTION SUPPORT?
Need Complete Submittal Package Assembly?
BuildDesk Partners reviews project manuals and Division specifications to compile exhaustive submittal registers, cross-checking product cutsheets and shop drawings to prevent costly Revise & Resubmit delays.