SAMPLE DELIVERABLE // BID COMPLIANCEEXAMPLE OUTPUT

Sample Deliverable: Bid Compliance Checklist

Comprehensive Audit of Instructions to Bidders & Required Attachments

CONFIDENTIALITY & SAMPLE ARCHITECTURE:

This is a conceptual layout prepared to illustrate data organization, column structures, and status tagging. Real client project information is never published without explicit written authorization.

24 ItemsRequirements Audited
19 ItemsDocumented In Set
3 ClarificationsAction Flags
2 AffidavitsCritical Missing
BD / 01 // DELIVERABLE OVERVIEW

How This Deliverable Was Constructed

This conceptual sample illustrates how BuildDesk audits project manuals, RFPs, and addenda. Every line item is linked directly to specification page numbers with clear readiness statuses.

SAMPLE METADATA
TARGET AUDIENCE:General Contractors & Subcontractors
CLIENT-SUPPLIED INPUT:Project Manual Division 00 & 01, Instructions to Bidders, Addenda 1-3, and draft contractor submission forms.
EXCEL DELIVERABLE PREVIEW

Bid Compliance Checklist — Data Layout

ALL CITATIONS TRACE TO PROVIDED DRAWINGS / SPECS
ITEM NO.DOCUMENT CITATIONREQUIREMENT DESCRIPTIONSUBMISSION FORMATSTATUSNOTES / FOLLOW-UP
01RFP Section 00 21 13 §3.1Standard Form of Bid (Signed & Sealed)Hardcopy Original + USBVERIFIEDForm signed by corporate officer
02Addendum 03, Page 2Acknowledgement of Addenda 1, 2 & 3Itemized on Bid Form p. 4VERIFIEDAll three addenda acknowledged
03Spec Section 00 43 13 §1.45% Bid Bond on AIA Document A310Original Bond with Power of AttorneyREVIEW REQUIREDSurety seal present; verify attorney-in-fact date
04RFP Vol 1, Section 00 45 19Non-Collusion Affidavit (Notarized)Notarized Affidavit FormACTION REQUIREDNotary block signature is blank
05RFP Vol 1, Section 00 45 26Subcontractor Utilization ScheduleTable listing MWBE % goalsCLARIFICATION REQUIREDGoal is 18%; draft list totals 15.5%
VISUAL GRAPHIC DELIVERABLE

Deliverable Markup Graphic

Bid Requirements Checklist • Audit Sheet Register

DELIVERABLE: COMPLIANCE MATRIX // MUNICIPAL RFP
Official Bid Proposal Form
FOUND / VERIFIED
Spec 00 41 13, p. 12•Mandatory
Audit Note: Signed by authorized corporate principal with seal
Addenda 1 & 2 Acknowledgement
FOUND / VERIFIED
Addendum 02, p. 1•Mandatory
Audit Note: All released addenda numbers & dates acknowledged
5% Bid Bond on AIA A310
RECHECK REQUIRED
Spec 00 21 13 §4.2•Mandatory
Audit Note: Draft bond provided; verify surety attorney-in-fact power
Non-Collusion Affidavit
NOT IDENTIFIED
RFP Vol 1, p. 28•Mandatory
Audit Note: Form attached but notary jurat block is blank
MWBE Participation Schedule
CLARIFICATION REQUIRED
Section 00 45 39•Conditional
Audit Note: RFP goal is 18%; draft submittal list totals 15.5%
CITATION // CITY OF CASPER RFP #2026-0812 • SPECIFICATION VOLUME 1 & 2
VERIFIED 5 OF 5 MANDATORY BID CRITERIA
Guaranteed 24–48 Hour Review Turnaround Available

HAVE A PROJECT READY?

Send your drawings, specifications, or addenda. Our senior preconstruction team will review the scope and deliver clear, traceable answers on guaranteed turnaround.

Direct Intake: ryan@builddeskpartners.comTurnaround: 24–48 Hours TypicalWyoming HQ & Florida Operations Hub