Sample Deliverable: Material Quantity Takeoff
Itemized Bill of Materials with Traceable Color Plan Markups
This is a conceptual layout prepared to illustrate data organization, column structures, and status tagging. Real client project information is never published without explicit written authorization.
How This Deliverable Was Constructed
Sample of our core supplier deliverable. Plan quantities are digitally extracted from architectural and structural drawings, with color-marked PDF verification drawings and itemized Excel workbooks.
Material Quantity Takeoff & Marked Drawings — Data Layout
| MATERIAL CODE | DESCRIPTION | NET PLAN QUANTITY | WASTE ALLOWANCE | QUOTE TOTAL | UNIT | DRAWING SHEET |
|---|---|---|---|---|---|---|
| RF-TPO-60 | 60-mil White TPO Membrane | 18,400 | 8% (1,472) | 19,872 | SF | Sheet A-301 (Field) |
| RF-ISO-20 | Polyisocyanurate Insulation (2.0") | 18,400 | 5% (920) | 19,320 | SF | Sheet A-301 (Base Layer) |
| FL-PAR-18 | Parapet Wall Flashing (18" Height) | 520 | 10% (52) | 572 | LF | Sheet A-301, Dtl 3/A-501 |
| CP-MET-24 | Prefinished Metal Coping Cap | 520 | 5% (26) | 546 | LF | Sheet A-301, Dtl 6/A-502 |
| DR-RF-04 | Roof Drain Lead Flashings & Rings | 6 | 0% | 6 | EA | Sheet A-301, M-101 |
Deliverable Markup Graphic
Trade Estimating & Quantity Takeoff • Color Plan Markups & Verified Schedule
60-mil TPO Membrane System
Mechanically fastened & induction welded. Net: 24,850 SF + 8% waste allowance.
Sheet A-201Polyiso Insulation (3.0" R-20)
Dual 1.5" staggered layers with approved fastener pattern. Net: 24,850 SF + 5% waste.
Spec 07 22 00Parapet Flashing Membrane (18" H)
Continuous perimeter parapet flashing & termination bar. Net: 640 LF + 10% overlap.
Dtl 4/A-502Coping Cap & Cleat Assembly
24-ga Kynar 500 prefinished galvanized steel with continuous cleat assembly.
Spec 07 71 00HAVE A PROJECT READY?
Send your drawings, specifications, or addenda. Our senior preconstruction team will review the scope and deliver clear, traceable answers on guaranteed turnaround.