Back to All Samples
SAMPLE DELIVERABLE // SCHEDULE EXTRACTIONEXAMPLE OUTPUT

Sample Deliverable: Product Schedule Extraction

Structured Data Extraction from Drawing PDFs into Quote-Ready Sheets

CONFIDENTIALITY & SAMPLE ARCHITECTURE:

This is a conceptual layout prepared to illustrate data organization, column structures, and status tagging. Real client project information is never published without explicit written authorization.

32 OpeningsScheduled Openings
31 VerifiedTags Verified on Plans
1 DiscrepancyMissing Tag Flags
4 Unique SetsHardware Groups
BD / 01 // DELIVERABLE OVERVIEW

How This Deliverable Was Constructed

Sample demonstrating door, hardware, and luminaire schedule extractions. PDF schedules are converted into clean, sortable spreadsheets cross-checked against floor plans.

SAMPLE METADATA
TARGET AUDIENCE:Distributor Sales Desks & Trade Contractors
CLIENT-SUPPLIED INPUT:Architectural Drawing Sheets A-601 (Door Schedule) & A-102 (Floor Plan).
EXCEL DELIVERABLE PREVIEW

Product Schedule Extraction Worksheet — Data Layout

ALL CITATIONS TRACE TO PROVIDED DRAWINGS / SPECS
DOOR MARKOPENING SIZEDOOR MATERIALFRAME MATERIALFIRE RATINGHARDWARE SETVERIFICATION STATUS
101-A3'-0" x 7'-0"Hollow Metal 18gaHollow Metal 16ga90 MinHW-1 (Panic / Closer)VERIFIED ON A-102
102-B3'-0" x 7'-0"Solid Core Oak WoodHollow Metal 16gaNon-RatedHW-2 (Office Lockset)VERIFIED ON A-102
103-A6'-0" x 7'-0" (Pr)Hollow Metal 16gaHollow Metal 14ga3 HourHW-3 (Auto Flush Bolts)VERIFIED ON A-102
108-C3'-0" x 7'-0"Solid Core Birch WoodHollow Metal 16ga20 MinHW-2 (Office Lockset)NOT SHOWN ON A-102
VISUAL GRAPHIC DELIVERABLE

Deliverable Markup Graphic

Scope Leveling Matrix • Subcontractor Trade Proposal Comparison

DIVISION 09 // DRYWALL & FRAMING
Metal Stud Framing (20ga Structural)ALIGNED
Spec: 05 40 00
Apex: Inc
Beacon: L4
Crest: Inc
Sound Batt Insulation in Demising WallsGAP (BEACON)
Spec: 07 21 00
Apex: Inc
Beacon: Exc
Crest: Inc
Level 5 Finish in 2-Story Atrium LobbyVARIANCE
Spec: 09 29 00
Apex: Inc
Beacon: L4
Crest: Inc
Fire-Treated Wood Backing & BlockingGAP (CREST)
Spec: 06 10 00
Apex: Inc
Beacon: L4
Crest: Exc
TRADE SCOPE LEVELING REGISTER // NORMALIZED BASE BIDS • EXCLUSION AUDIT
CONFIRMED DELIVERABLE STANDARD
Guaranteed 24–48 Hour Review Turnaround Available

HAVE A PROJECT READY?

Send your drawings, specifications, or addenda. Our senior preconstruction team will review the scope and deliver clear, traceable answers on guaranteed turnaround.

Direct Intake: ryan@builddeskpartners.comTurnaround: 24–48 Hours TypicalWyoming HQ & Florida Operations Hub