Back to All Samples
SAMPLE DELIVERABLE // SCOPE COMPARISONEXAMPLE OUTPUT
Sample Deliverable: Scope Gap & Bid Comparison
Multi-Subcontractor Proposal Normalization & Scope Alignment
CONFIDENTIALITY & SAMPLE ARCHITECTURE:
This is a conceptual layout prepared to illustrate data organization, column structures, and status tagging. Real client project information is never published without explicit written authorization.
3 ProposalsBids Leveled
16 Line ItemsStandardized Scopes
4 ItemsScope Exclusions Flagged
2 InquiriesClarifications Needed
BD / 01 // DELIVERABLE OVERVIEW
How This Deliverable Was Constructed
Demonstration of normalized trade proposals. BuildDesk extracts line-item inclusions, exclusions, and qualifications across competing trade bids into a clear side-by-side leveling spreadsheet.
SAMPLE METADATA
TARGET AUDIENCE:General Contractors & Construction Managers
CLIENT-SUPPLIED INPUT:3 trade subcontractor proposals, project plans, and Division 08 / 09 specifications.
EXCEL DELIVERABLE PREVIEW
ALL CITATIONS TRACE TO PROVIDED DRAWINGS / SPECSScope Gap & Bid Comparison Matrix — Data Layout
| TRADE SCOPE ITEM | SPEC CITATION | BIDDER A (APEX) | BIDDER B (BEACON) | BIDDER C (CREST) | LEVELING STATUS |
|---|---|---|---|---|---|
| Metal Stud Wall Framing | 05 40 00 | INCLUDED (20ga) | INCLUDED (20ga) | INCLUDED (25ga noted) | GAUGE VARIANCE |
| Sound Attenuation Blankets | 07 21 00 §2.2 | INCLUDED | EXCLUDED | INCLUDED | SCOPE GAP (B) |
| Fire-Treated Blocking for Casework | 06 10 00 §2.3 | INCLUDED | INCLUDED | EXCLUDED | SCOPE GAP (C) |
| Clean-Up to Central Dumpster | 01 74 00 | Daily clean included | Broom clean weekly | Dumpster pulls excluded | CLARIFY TERMS |
VISUAL GRAPHIC DELIVERABLE
Deliverable Markup Graphic
Scope Leveling Matrix • Subcontractor Trade Proposal Comparison
DIVISION 09 // DRYWALL & FRAMING
| SCOPE LINE ITEM | CSI SPEC | BIDDER A (APEX) | BIDDER B (BEACON) | BIDDER C (CREST) | LEVELING STATUS |
|---|---|---|---|---|---|
| Metal Stud Framing (20ga Structural) | 05 40 00 | INCLUDED | INCLUDED | INCLUDED | ALIGNED |
| Sound Batt Insulation in Demising Walls | 07 21 00 | INCLUDED | EXCLUDED | INCLUDED | GAP (BEACON) |
| Level 5 Finish in 2-Story Atrium Lobby | 09 29 00 | INCLUDED | Level 4 Only | INCLUDED | VARIANCE |
| Fire-Treated Wood Backing & Blocking | 06 10 00 | INCLUDED | INCLUDED | EXCLUDED | GAP (CREST) |
Metal Stud Framing (20ga Structural)ALIGNED
Spec: 05 40 00
Apex: Inc
Beacon: L4
Crest: Inc
Sound Batt Insulation in Demising WallsGAP (BEACON)
Spec: 07 21 00
Apex: Inc
Beacon: Exc
Crest: Inc
Level 5 Finish in 2-Story Atrium LobbyVARIANCE
Spec: 09 29 00
Apex: Inc
Beacon: L4
Crest: Inc
Fire-Treated Wood Backing & BlockingGAP (CREST)
Spec: 06 10 00
Apex: Inc
Beacon: L4
Crest: Exc
TRADE SCOPE LEVELING REGISTER // NORMALIZED BASE BIDS • EXCLUSION AUDIT
CONFIRMED DELIVERABLE STANDARD
Guaranteed 24–48 Hour Review Turnaround Available
HAVE A PROJECT READY?
Send your drawings, specifications, or addenda. Our senior preconstruction team will review the scope and deliver clear, traceable answers on guaranteed turnaround.
Direct Intake: ryan@builddeskpartners.comTurnaround: 24–48 Hours TypicalWyoming HQ & Florida Operations Hub